Commodity Description
(10GigE Sensors and NIC)
Agency for Defense Development
Defense Test Research Institute
1
1. Introduction
This RFP defines the general requirements for the 10GigE Sensors and
NICs to be used at the Defense Test Research Institute of Agency for Defense
Development (ADD) in South Korea.
2. Components
| Item No. | Description | Unit | Q’ty |
| 01 | 7mega pixels sensor | Set | 4 |
| 02 | 5mega pixels sensor | Set | 2 |
| 03 | 1.8mega pixels sensor | Set | 2 |
| 04 | 25G Network Interface Card | EA | 4 |
3. Specification
A. 7mega pixels sensor 4 Set (HR-7000-S-C-E2 EF or equivalent)
- Resolution ≥ 7mega pixels
- Frame rate ≥ 160fps @ 7mega pixels
- Weight < 1kg
- Operating temperature: -20~50℃ or more
B. 5mega pixels sensor 2 Set (HB-5000-SB-C-E2 EF or equivalent)
- Resolution ≥ 5mega pixels
- Frame rate ≥ 200fps @ 5mega pixels
- Weight < 1kg
- Operating temperature: -20~50℃ or more
C. 1.8mega pixels sensor 2 Set (HR-1800-S-C-E2 EF or equivalent)
- Resolution ≥ 1.8mega pixels
- Frame rate ≥ 600fps @ 1.8mega pixels
- Weight < 1kg
- Operating temperature: -20~50℃ or more
2
D. Others
- Four (4) 25G Network Interface cards(Nvidia Mellanox ConnectX-6 or equivalent)
should be included and compatible with sensor unit
- Power cables for the sensor units should be included
- Canon EOS mount should be installed on the sensor units and control the lenses remotely
4. Shipment
The contractor shall ship the entire commodities within 3 months from the
effective date of the contract.
5. Documentation
The contractor shall prepare and deliver the technical document regarding
hardware and software.
6. Warranty
The contractor shall warrant the optical sensor units for a period of one
year after completion of delivery. The contractor shall provide the standard
warranty services during the warranty period without extra charges.
7. Payment Schedule
The payment schedule is based on the below table.
Table 1. Payment Schedule
| NO | Milestone | Contract | Required Document | ||
| Value | |||||
| 1 | After Shipping | 90% | Shipping Documents | ||
| 2 | Acceptance Inspection | 10% | Implementation Certificate | ||
| Total Amount of Contract value | 100% |
3
8. Evaluation
The proposals are to be evaluated during the period of evaluation. The draft
guidance for technical evaluation score excepting the bidding price is given
in the following table.
| Evaluation category | Evaluation items | Score | ||||||
| Specifications | 10GigE Sensors and NIC | |||||||
| Resolution | 30 | |||||||
| Framerate @ Full resolution | 50 | |||||||
| EOS mount and remote lens control | 10 | |||||||
| Weight | 5 | |||||||
| Operating temperature | 5 |
During evaluation, supplementary information could be requested to clarify
the meaning of the proposals.
4